Case Studies
Case 1 - Pukekohe North School - circa 2019
This contracted project was requested by the schools principal. They required a completely non-existent lighting rig in the hall, repaired and upgraded to a modern standard so the students could learn lighting and operate shows and events in the hall.
The project involved inspection of existing infrastructure, quoting on new fixture and hardware, including a new Chauvet 6 way DMX datasplitter, 6 X chauvet SlimPar Q12 Bluetooth capable RGBA LED Wash and 6 x used 650W Zoomspot Profiles (due to budget constraints) and cabling and data cabling.
Installtion of new fixtures, re-regging existing fixture, focusing and tidy up of rigging.
Finally programming and training of staff to use the new equipment.
Project hour was approximately 5 x 8 hours business days to complete.
Customer was extremely satisfied with the completed work.
- Installation of 6 x Chauvet SlimPar Q12 Bluetooth Capable RGBA LED Wash Lightings
- Installation of 6 x Selecon 650W Zoomspot Profiles
- Installation of Bheringer LC2412 Console
- Installation of DMX Data Cabling & Power Cabling
- Re-rigging and Patching of Selecon 650W Zoomspot Profiles
- Programming Pre-set Stage Looks for General School Use & Patch Plans & Documentation



















































Case Studies
Case 2 - Renew Church - Whangarei - circa 2017-2019
This contracted project was requested by Renew Church Whangarei working with Mathew Guddat the church’s youth pastor.
The project involved inspection of existing infrastructure, and long low cost rental of the equipment over a ~2 years rental period.
lighting equipment was rented between 2017 to 2019 to enable the church to modernise their lighting system without the burden of a large capital expenditure.
Installation of new fixtures, re-regging existing fixture, focusing and tidy up of rigging, and programming the rig. FOH control using (formerly Martin M-PC) Elation Obsidian ONYX Lighting control system, with, DMX input via a standard Behringer LC2412 DMX lighting Console.
Finally programming and training of staff to use the new equipment.
Project hour was approximately 5 x 8 hours business days to complete.
Customer was extremely satisfied with the completed work.
- 6 x Chauvet COLORband PIX LED Wash Bars
- 6 x FancySun 90W LED Moving Yoke Fixtures
- 6 x Geni OBY-3 250W MSD Moving Yoke Fixtures
- 8 x Chauvet Freedom Sticks
- 1 x Elation ONYX PC Lighting Console
- Programming Pre-set Stage Looks for General School Use & Patch Plans & Documentation





































































Case Studies
Case 3 - Harrington Theatre - circa 2020
- 6 x Chauvet COLORband PIX LED Wash Bars
- 6 x FancySun 90W LED Moving Yoke Fixtures
- 4 x Geni OBY-3 250W MSD Moving Yoke Fixtures
- 8 x Chauvet Freedom Sticks
- 6 x High End Color Commander CMY 1kW Fresnels
- 6 x Clay Paky Sharpy Beam 200 Moving Yokes
- 4 x RGBWAUV Wash Moving Yokes
- 1 x Elation ONYX PC Lighting Console
- 1 x Martin M-Touch Console
- Programming Pre-set Stage Looks for General School Use & Patch Plans & Documentation
This contracted project was requested by Pukekohe Performing Arts based at Harrington Theatre in Pukekohe. working with Sharon Tuapawa the Theatre Manager.
The project involved inspection of existing infrastructure, Installation of out service equipment, re-rigging and focusing existing conventional lighting fixtures (Fresnels, Zoomspots and PC’s), and installation of Hired fixtures and cabling, a long low cost rental of the equipment over a ~2 years rental period. 3 Universes of DMX was required to complete control of the new lighting rig, along with two 6 way opto-isolated DMX data splitters.
lighting equipment was rented on a show by show basis in-place between 2020 to 2023 to enable the theatre to modernise their lighting system without the burden of a large capital expenditure.
Installation of new fixtures, re-regging existing fixture, focusing and tidy up of rigging, and programming the rig. FOH control using (formerly Martin M-PC) Elation Obsidian ONYX Lighting control system, with, DMX input via a standard Behringer LC2412 DMX lighting Console.
Finally programming and training of staff to use the new equipment.
Project hour was approximately 5 x 8 hours business days to complete.
Customer was extremely satisfied with the completed work.